Skip to main content
Chapter 6 of 8
Important Questions

Change Management — Important Questions

ICSE · Class 11 · Business Studies

45 important questions from Change Management for ICSE Class 11 Business Studies, with answers. Includes multiple choice questions.

45 questions44 flashcards5 concepts

Interactive on Super Tutor

Studying Change Management? Get the full interactive chapter.

Quizzes, flashcards, AI doubt-solver and a step-by-step study plan — built for important questions and more.

Free trial, no card needed.

45 Questions·
multiple choice

Important Questions from Change Management

1multiple choice
1 marks

What does the letter 'A' stand for in the ADKAR model?

Show answer

Awareness

Step 1: ADKAR is an acronym where each letter stands for a specific building block of change. Step 2: The first 'A' stands for Awareness — employees must be made aware of what change is happening and why it is necessary. Step 3: Without awareness, employees lose motivation and direction. Step 4: The second 'A' in ADKAR stands for Ability (the fourth step), not the first. Step 5: Adaptability and Acceptance are not part of the ADKAR model at all.

2multiple choice
1 marks

In the ADKAR model, what does 'R' stand for?

Show answer

Reinforcement

Step 1: In the ADKAR model, the last step is Reinforcement. Step 2: Reinforcement is necessary to sustain the change permanently and prevent employees from slipping back into old habits. Step 3: Methods of reinforcement include rewards, recognition, corrective actions, celebrations, and feedback. Step 4: 'Resistance' is actually something the ADKAR model tries to overcome, not a step in the model. Step 5: Revision and Recognition are not part of the ADKAR acronym.

3multiple choice
1 marks

Kurt Lewin's Change Management Model is also known as:

Show answer

Unfreeze-Change-Refreeze Model

Step 1: Kurt Lewin developed his change model in the 1940s and it is called the Unfreeze-Change-Refreeze model. Step 2: He used the analogy of an ice block — to change a cube of ice into a cone, you must first melt it (unfreeze), reshape it (change), then refreeze it into the new shape. Step 3: The ADKAR model was developed by Jeff Hiatt, not Kurt Lewin. Step 4: Plan-Do-Check-Act is a quality improvement model, not related to Lewin. Step 5: Awareness-Desire-Knowledge are steps in ADKAR, not Lewin's model.

4multiple choice
1 marks

In Kurt Lewin's model, what happens during the 'Unfreezing' stage?

Show answer

Existing ways of doing things are broken down so people are ready to accept new alternatives

Step 1: The Unfreezing stage is the first stage in Lewin's model. Step 2: During this stage, the existing beliefs, processes, and behaviours are shown to be no longer appropriate for the current situation. Step 3: Members of the organisation are made to realise that the old ways need to change — this prepares them psychologically to accept new methods. Step 4: Making changes permanent is the Refreezing stage, not Unfreezing. Step 5: Unfreezing is about creating readiness for change, not just training or closing down.

+41 more questions on Change Management (ICSE Class 11 Business Studies)

Practise All

Frequently Asked Questions

What are the important topics in Change Management for ICSE Class 11 Business Studies?
Key topics in Change Management include Meaning and Concept of Change Management, Types of Change, Need for Planned Change, Resistance to Change. Study these first, then practise questions on each for Class 11 exams.
How many important questions are there in Change Management?
Super Tutor has 45 practice questions for Change Management, including multiple choice questions. A sample with answers is on this page.

Sources & Official References

Content is aligned to the official syllabus. Refer to the board website for the latest curriculum.

For serious students

Get the full Change Management chapter — start free.

Quizzes, flashcards, an AI doubt solver and a study plan for ICSE Class 11 Business Studies. Free to start, no card needed.